A process to assess risks, to determine if risk reduction is required and to develop a plan to maintain risks at an acceptable level
Answer : A
Rbi may include methodologies to assess the effectiveness of the management systems in maintaining
Answer : A
Consequence side of the risk equation is normally managed by
Answer : C
________________may result in the calculated corrosion rate appearing artificially high or low.
Answer : B
Limitation of any negative consequence or reduction in probability of a particular event
Answer : B
If a very aggressive acid is carried over from a corrosion resistant part of a system into a downstream vessel that is made of carbon steel, the result would be
Answer : A
The risk prior to mitigation activities
Answer : A