Question 1

A process to assess risks, to determine if risk reduction is required and to develop a plan to maintain risks at an acceptable level



Answer : A


Question 2

Rbi may include methodologies to assess the effectiveness of the management systems in maintaining



Answer : A


Question 3

Consequence side of the risk equation is normally managed by



Answer : C


Question 4

________________may result in the calculated corrosion rate appearing artificially high or low.



Answer : B


Question 5

Limitation of any negative consequence or reduction in probability of a particular event



Answer : B


Question 6

If a very aggressive acid is carried over from a corrosion resistant part of a system into a downstream vessel that is made of carbon steel, the result would be



Answer : A


Question 7

The risk prior to mitigation activities



Answer : A