Question 1

[Installation Procedures]

The mock-up for vibration cast installations demonstrates the adequacy of the: (This may have more than one correct answer; please select all that apply.)



Answer : B, C, D


Question 2

[Inspection and Testing Requirements]

For as-installed testing in casting applications, what is the minimum number of cast samples required by each mixing crew per material per shift?



Answer : B


Question 3

[Material Requirements]

Each sample tested in accordance with ASTM C181 for workability index shall consist of how many specimens?



Answer : C


Question 4

[Responsibilities and Qualifications]

The installation contractor is required to secure an advance agreement that concerns all the installation details from the:



Answer : C


Question 5

[Installation Procedures]

If the refractory lining is required before pressure testing, all pressure-retaining welds shall:



Answer : C


Question 6

[Inspection and Testing Requirements]

Gunning test panels are constructed with removable back panels:



Answer : B


Question 7

[Inspection and Testing Requirements]

Which party provides the quality requirements for hammer testing, extent of cracking, and surface voids?



Answer : A