API Refractory Personnel API-936 Exam Practice Test

Page: 1 / 14
Total 85 questions
Question 1

[Inspection and Testing Requirements]

As-installed gunned test specimens are prepared by cutting specimens with a:



Answer : A


Question 2

[Installation Procedures]

Which of the following is a longitudinally hinged anchoring system for curved applications?



Answer : D


Question 3

[Installation Procedures]

The mock-up for vibration cast installations demonstrates the adequacy of the: (This may have more than one correct answer; please select all that apply.)



Answer : B, C, D


Question 4

[Inspection and Testing Requirements]

An alternative to wire mesh baskets is a panel with enclosed sides when the:



Answer : B


Question 5

[Material Requirements]

Which of the following is false per the requirements of API Standard 936?



Answer : A


Question 6

[Installation Procedures]

Ceramic fiber batten strips shall be:



Answer : D


Question 7

[Inspection and Testing Requirements]

For as-installed testing in casting applications, what is the minimum number of cast samples required by each mixing crew per material per shift?



Answer : B


Page:    1 / 14   
Total 85 questions