Question 1

[Responsibilities and Qualifications]

The installation contractor is required to secure an advance agreement that concerns all the installation details from the:



Answer : C


Question 2

[Inspection and Testing Requirements]

Gunning test panels are constructed with removable back panels:



Answer : B


Question 3

[Material Requirements]

Which of the following conditions must be met for test results from trial mixes of low cement castables to be accepted for qualification?



Answer : A


Question 4

[Inspection and Testing Requirements]

From each production run, the testing frequency for erosion service refractory is one sample per:



Answer : B


Question 5

[Terms, Definitions, and Abbreviations]

Which of the following is the term for aggregate and/or cement that bounces away from a surface against which refractory is being projected by gunning?



Answer : C


Question 6

[Material Requirements]

Each sample tested in accordance with ASTM C181 for workability index shall consist of how many specimens?



Answer : C


Question 7

[Material Requirements]

When water is used for refractory installed on a carbon steel surface with a stainless steel anchorage, the chloride content of the potable water shall not exceed:



Answer : A