API Refractory Personnel API-936 Exam Practice Test

Page: 1 / 14
Total 85 questions
Question 1

[Installation Procedures]

When installing refractory castables in hot weather conditions, which of the following is acceptable? (This may have more than one correct answer; please select all that apply.)



Answer : A, C, D


Question 2

[Inspection and Testing Requirements]

Abrasion resistance of a material is reported as loss of:



Answer : C


Question 3

[Terms, Definitions, and Abbreviations]

A layer coat of refractory lining that is applied to an existing lining in an attempt to extend the lining's life is known as:



Answer : B


Question 4

[Material Requirements]

Who is responsible to provide details of metal fiber reinforcement including dimensions, concentration, type and metallurgy?



Answer : B


Question 5

[Inspection and Testing Requirements]

Which party provides the quality requirements for hammer testing, extent of cracking, and surface voids?



Answer : A


Question 6

[Inspection and Testing Requirements]

Which of the following is a quality control element?

(This may have more than one correct answer; please select all answers that apply.)



Answer : A, B, C


Question 7

[Responsibilities and Qualifications]

The installation contractor is required to secure an advance agreement that concerns all the installation details from the:



Answer : C


Page:    1 / 14   
Total 85 questions