The time needed to unload and load must be shorter than .
Answer : A
If the run time per piece on operation B is shorter than that on A, the first batch must be larger enough to avoid idle time on operation A
Answer : B
Backward scheduling is used to determine when an order must be started.
Answer : A
When the last operation is on the routing is scheduled first and is scheduled for complete at the due date, this is called:
Answer : D
Which file contains a list of the single-level components and quantities needed to assemble a parent?
Answer : B
The time a job waits at a work center before being handled is called:
Answer : A
Which file contains information on the capacity and move, wait, and queue times associated with the center?
Answer : A