ASQ Six Sigma Green Belt CSSGB Exam Questions

Page: 1 / 14
Total 200 questions
Question 1

A Belt concludes a Lean Six Sigma project with the creation of a Control Plan. At what point can the Control Plan be closed?



Answer : A


Question 2

In the late 1980's William Smith coined the name Six Sigma for a methodology that had its origins at __________________ for quality related work being done there.



Answer : D


Question 3

A Six Sigma tool that helps to screen factors by using graphical techniques to logically subgroup multiple discrete X's plotted against a continuous Y is known as a _____________Chart.



Answer : B


Question 4

Significant variation in process performance is a consequence of several causes that can be classified using which of the terminologies shown. (Note: There are 2 correct answers).



Answer : A, D


Question 5

When analyzing a data set we frequently graph one metric as a function of another. If the slope of the Correlation line is -2.5 we would say the two metrics are ___________ correlated?



Answer : C


Question 6

The X-Y Diagram is a tool used to identify/collate potential X's and assess their relative impact on multiple Y's.



Answer : A


Question 7

Which of these are correct if Cpk Upper is 2.0 and Cpk Lower is 1.0?



Answer : C


Page:    1 / 14   
Total 200 questions