Question 1

Which of the following statements does NOT describe good practice for maintaining the TAS?



Answer : A


Question 2

Your goal is to verify completeness, consistency and correct behavior of an automated test suite. The TAS has been proven to successfully install in the SUT environment. All the preliminary checks to verify the correct functioning of the automated test environment and test tool configuration, installation and setup have successfully completed.

Which of the following is NOT a relevant check for achieving your goal in this scenario?



Answer : D


Question 3

You are executing the first test run of a test automation suite of 200 tests. All the relevant information related to the state of the SUT and to the automated test execution is stored in a small database. During the Automated test run you observe that the first 10 test pass, while an abnormal termination occurs when executing the 11th test. This test does not complete its execution and the overall execution of the suite is aborted. An immediate analysis of the abnormal termination is expected to be time consuming and you have been asked to produce a detailed report of the execution results for the first test run, as soon as possible.

What is the MOST important FIRST step to be taken immediately after the abnormal occurred when executing the 11th test?



Answer : C


Question 4

Which of the following BEST describes why it is important to separate test definition from test execution in a TAA?



Answer : C


Question 5

You are currently designing the TAA of a TAS. You have been asked to adopt an approach for automatically generating and executing test cases from a model that defines the SUT. The SUT is a state-based and event-driven that is described by a finite-state machine and exposes its functionality via an API. The behavior of the SUT depends on hardware and communication links that can be unreliable.

Which of the following aspects is MOST important when designing the TAA in this scenario?



Answer : C


Question 6

Which of the following attributes should NOT be included in a test execution report associated with a suite of automated tests?



Answer : C


Question 7

Consider a TAS deployed into production. The SUT is a web application and the test suite consists of a set of automated regression tests developed via GUI. A keyword-driven framework has been adopted for automating the regression tests. The tests are based on identification at low-levels of the web page components (e.g class indexes, tab sequence indexes and coordinates) in the next planned release the SUT will be subject to significant corrective maintenance (bug-fixes) and evolution (new features) Maintenance costs to update the test scripts should be as low as possible and the scripts must be highly reusable.

Which of the following statements is most likely to be TRUE?