Cisco Designing Cisco Data Center Infrastructure 300-610 DCID Exam Questions

Page: 1 / 14
Total 299 questions
Question 1

Which two paths are provided by deploying an OOB management network in a data center that uses Cisco Nexus switches? (Choose two.)



Answer : B, D


Question 2

Refer to the exhibit.

Refer to the exhibit. An engineer builds a data center network design using EVPN technology. Within the design, the fabric acts as a gateway. Traffic from host X to host Y must pass through the Cisco ASA firewall for deep packet inspection and increased security. Which firewall deployment must the engineer choose to accomplish this goal?



Answer : B


Question 3

A customer deploying Cisco UCS blade servers must centrally manage VLANs carried by the server interfaces. Interface properties must be updated in one location and applied to multiple servers simultaneously, including after the servers have been deployed. Which technology must the customer use?



Answer : D


Question 4

Which type fields can an engineer use to identify an iSCSI participant? (Choose two.)



Answer : C, E


Question 5

A network consultant reviews the requirements for the Storage Area Network (SAN) design. The proposed solution must offer a very efficient port usage and eliminate the need for a separate physical layer of switches and their associated ISLs. The design is not expected to require future expansion.

Which SAN topology must be used to meet these requirements?



Answer : A


Question 6

Refer to the exhibit During a synchronization of port rotes, a device receives a proposal message on one of its ports that is selected as the new root port. The logs show that Rapid PVST+forced all other ports to synchronize with the new loot information. The engineer analyzes the port stales and concludes that the device is synchronized with superior root information received on the root port, and all other ports are synchronized. What happens to a designated port that is in the forwarding state and is not configured as an edge port, if Rapid PVST+ forces it to synchronize with new root information?



Answer : D


Question 7

A data center with over 4000 VLANs must be stretched lo a disaster recovery site. The solution must support the migration of virtual machines to a disaster recovery site. To support the scalability of the solution, the internal fabric of the main site must be from the DCI network. The connecting network infrastructure uses a 10 Gbps link with PIM ASM supported, which will be replaced with a different overlay in the next 12 months. The solution must support head-end replication for broadcast, unknown unicast, and multicast traffic. Which solution must be used to meet these requirements?



Answer : D


Page:    1 / 14   
Total 299 questions