Dell EMC DES-4421 Specialist - Implementation Engineer PowerEdge MX Modular Exam Practice Test

Page: 1 / 14
Total 54 questions
Question 1

What configuration is supported for a fully populated MX740c compute sled?



Answer : D


Question 2

Where is a valid storage location for extracting the full MX7000 chassis logs package?



Answer : C


Question 3

An administrator is asked to install and power-on a new MX740c sled in an MX7000 chassis. The administrator inserts the sled and presses the power button. They notice that the power button LED is blinking green. After a short time power button turns to solid green and the server finally turns on.

What operation was in progress when the power button was blinking green?



Answer : A


Question 4

Refer to the exhibit.

How many internal server-facing ports are available on this I/O module for the MX7000 chassis?



Answer : C


Question 5

An administrator is configuring a fully populated MX5016s storage sled to be accessed by four MX740c compute sleds. Each compute sled has an H745P Jumbo PERC installed. The disks in the storage sled are evenly distributed across all compute sleds using a Drive-Assigned storage configuration.

What is the maximum number of disks that each compute sled can detect from the MX5016s?



Answer : D


Question 6

At the initial release of the MX7000 for a daisy-chained configuration in a multi-chassis management group (MCM)m what is the maximum number of member chassis allowed, not counting the lead chassis?



Answer : A


Question 7

What is the benefit of C22 power inlet connectors on the MX7000 chassis?



Answer : A


Page:    1 / 14   
Total 54 questions