Dell VxRail Design D-VXR-DS-01 Exam Questions

Page: 1 / 14
Total 40 questions
Question 1

What are three benefits of using the VxRail Configuration Portal? (Choose three.)



Answer : B, D, E

Validating the environment before deployment ensures readiness and reduces deployment issues.

Sharing configurations between project members facilitates collaboration and consistency.

Validating the configuration settings helps confirm correct setup prior to deployment.


Question 2

In which scenario would an architect specify VxRail Dynamic Nodes?



Answer : C

VxRail Dynamic Nodes are specified when a customer wants to refresh their server environment but already has a PowerStore 5200T storage array, allowing integration of external storage with VxRail compute nodes.


Question 3

Which application package is by default included when using the VxRail Sizer Tool?



Answer : A

The VxRail Sizer Tool includes vRealize Log Insight by default as part of the application package for integrated log management and analytics in the VxRail environment.


Question 4

Which document from the VxRail Configuration Portal can be used to validate site readiness before a deployment?



Answer : B

The Pre-deployment Checklist from the VxRail Configuration Portal is used to validate site readiness by ensuring all necessary prerequisites and environment conditions are met before deployment.


Question 5

A customer is planning to expand an existing VxRail vSAN cluster. Their current rack is full, so the cluster has to expand to an additional rack. Due to networking requirements, each rack is a Layer 2 boundary, so the new nodes require new management, vSAN, and vMotion subnets.

When designing the solution, what are two considerations that the architect should consider? (Choose two.)



Answer : A, B

Because each rack is a Layer 2 boundary with different subnets, automatic node discovery is not supported, so manual discovery is required.

VxRail Manager must remain in the original rack to maintain cluster management continuity across racks.


Question 6

What is a result of using the VxRail Sizing Tool to size a new cluster?



Answer : C

The VxRail Sizing Tool focuses on the specific workload requirements provided, sizing the cluster based on single or combined workload profiles rather than price considerations.


Question 7

What is the minimum number of nodes required for erasure coding with FTT=2 in a vSAN ESA cluster?



Answer : A

For erasure coding with a Failure to Tolerate (FTT) of 2 in a vSAN ESA cluster, a minimum of 5 nodes is required to provide the necessary redundancy and data protection.


Page:    1 / 14   
Total 40 questions