Question 1

A GIS analyst is working with LAS data with 17 million points on the map. The points are too big and cover the underlying areas completely. The analyst needs to change the dimensions of the points.

Which action should the analyst take to meet this requirement?



Answer : C


Question 2

A GIS analyst receives a dataset of precipitation change over the past five years, by country, for the entire world. The analyst is creating a map that will display this information. A requirement of the map is to preserve the area of each country.



Answer : B


Question 3

A GIS analyst receives a feature class with a unique date-time attribute. Each feature contains a single time field. Once the feature class is added to a map view, the layer can be time-enabled.

Which workflow should be used to enable the temporal attribute so that this layer can use the time slider?



Answer : A


Question 4

A GIS analyst wants to change the coordinate system of a hydrant dataset from WGS 1984 to NAD 1983 UTM Zone 15N.

Which tool will allow the data to be correctly transformed into the new coordinate system?



Answer : C


Question 5

A GIS intern is examining two feature classes to determine whether there are any differences in the geometry, attributes, and spatial reference.

Which geoprocessing tool should the intern use?



Answer : C


Question 6

A GIS analyst is about to run analysis using multiple feature layers from the current map. They want to do one final check to ensure which feature classes do and do not have definition queries as expected.

How should the analyst check this most efficiently?



Answer : B


Question 7

A GIS analyst is trying to conduct overlay analysis using the Union tool but is unable to run the tool due to a red X in one of the parameters.



Answer : B