GAQM CLSSBB-001 Certified Lean Six Sigma Black Belt (CLSSBB) CLSSBB Exam Practice Test

Page: 1 / 14
Total 300 questions
Question 1

If a process has subgroups for Variable data and the process runs for a long period of time, then the best pair of SPC Charts to use would be an Xbar and _________.



Answer : C


Question 2

Which statement(s) are incorrect about Fractional Factorial Designs?



Answer : C


Question 3

If in an experiment all possible variable pairs sum to zero the design is Orthogonal.



Answer : A


Question 4

If the production is for higher volume and monitoring and the Mean and variability is to be monitored for four machines producing product and the characteristic to be monitored is Variable Data, which SPC Chart is best to be selected?



Answer : A


Question 5

Situations where standardized work needs to be incorporated include all of these except _____________________.



Answer : A


Question 6

For the data shown here which statement(s) are true? (Note: There are 2 correct answers).



Answer : B, D


Question 7

Which statement(s) are correct about the Factorial Plot shown here? (Note: There are 3 correct answers).



Answer : A, B, C


Page:    1 / 14   
Total 300 questions