HP Architecting Advanced HPE Server Solutions HPE0-S22 Exam Questions

Page: 1 / 14
Total 96 questions
Question 1

A customer has an HPE Integrity Superdome X system with an nPartition that has been provisioned with a supported OS and application.

What first detects data corruption caused by an installed DIMM module?



Answer : D


Question 2

A customer needs high performance computing (HPC) and a small-scale solution with up to eight processors. The solution should also provide storage in a modular form factor. The customer's HPC application is designed so that some nodes act as compute nodes while others act as storage nodes that serve data to the compute nodes.

Which HPE Apollo system is most appropriate for this situation?



Answer : B


Question 3

A customer requires a server infrastructure update for its Hadoop HBase solution. The HBase maximum

dataset size will be 120TB.

To host HBase, the architect is planning three HPE Moonshot 1500 chassis fully populated with cartridges.

The populated chassis provide the following in total:

- 135 processors with four 2.9GHz cores each

- 4.23TB RAM

- 64.8TB local storage on SSDs

An aspect of the design is under provisioned and is likely to cause performance to degrade to one-tenth or even one-hundredth of its potential.

How can the architect resolve this problem?



Answer : C


Question 4

A customer operates a data center based on third-party servers, which includes third-party storage with an iSCSI SAN.

The architect needs to design a solution that can seamlessly access the current data from a new HPE Moonshot system.

How can the HPE Moonshot system access the legacy storage?



Answer : B


Question 5

Under which Transformation Area do HPE Moonshot solutions with Citrix fail?



Answer : A


Question 6

View the Exhibit.

Refer to the exhibit. An architect is planning an HPE Moonshot System with m710 cartridges to support a customer application virtualization solution. The customer indicated that the maximum acceptable response time for the solution is three seconds. The architect has implemented a POC and tested a single cartridge with different numbers of user sessions.

The architect monitored resource utilization throughout the tests. The results of the test with the point at which the response time exceeded three seconds are shown, marked as the "VSI max."

What should the architect conclude from this test?



Answer : A


Question 7

A customer needs to streamline monitoring for its HPE Apollo 6000 solution.

Which benefit can HPE Advanced Power Management (APM) provide to this customer?



Answer : A


Page:    1 / 14   
Total 96 questions