HP Aruba Certified Switching Expert Written HPE6-A69 Exam Practice Test

Page: 1 / 14
Total 60 questions
Question 1

Refer to the exhibit.

Criteria

1. All outbound traffic to AS 64516 prefers Edge-2 to AS 64516

2. All other outbound traffic prefers Edge-1 to AS 64513

Given the customer connectivity depicted in the diagram which single change can be performed on Edge-2 to ensure the criteria are met?



Answer : D


Question 2

With the given access-list:

Which statement is true about hardware resource consumption of this ACL?



Answer : C


Question 3

A customer with an ArubaOS-CX 6300M switch is having a performance issue on the network and has received complaints about users experiencing intermittent connectivity. After performing troubleshooting it is determined that many of the local websites on the LAN that users are unable to reach are resolved to an invalid MAC address

What are the minimum steps that should be performed to mitigate this condition? (Select two.)



Answer : B, E


Question 4

(Scenarios may contain multiple errors which may or may not impact the solution)

Refer to the Exhibit.

An engineer has attempted to configure two pairs of switches m the referenced configuration it Is required to implement

Multi-Chassis Link Aggregation for each pair of switches

The ports of the Aruba 8325 switches used for Agg01 and Agg02 are populated as follows

The configuration includes:

There is an error message stating "mismatched group speed" What should you add to the configuration to correct the error?



Answer : C


Question 5

You have designed a new wired solution for a customer that uses gateways and Dynamic Segmentation Which statements about User-Based Tunneling are true? (Select two)



Answer : B, C


Question 6

You need to establish a baseline summary of an ArubaOS-CX switch resource utilization after enabling new NAE scripts. How should you define a baseline for switch resource consumption? (Select two.)



Answer : B, D


Question 7

Refer to the exhibit.

A customer has implemented this ArubaOS-CX solution. NetEdit is not present. After a while, the secondary node of the VSX-cluster fails. What is the correct procedure to replace the failed node as quickly as possible?



Answer : A


Page:    1 / 14   
Total 60 questions