Huawei HCIA-Data Center Facility V2.0 H12-411_V2.0 Exam Questions

Page: 1 / 14
Total 204 questions
Question 1

CLF Defined as the power consumption of data center cooling equipment and IT The ratio of equipment power consumption.



Answer : A


Question 2

During the construction process, the nitrogen bottle operation must be equipped with special ____________ .

See Below Explanation:




Answer : A


Question 3

Climbing personnel must be equipped with necessary safety belts that meet the safety requirements, and use them correctly and reasonably according to the use regulations, while being supervised.



Answer : A


Question 4

() is a fire detector that detects smoke particles.



Answer : C


Question 5

Huawei Monitoring System NetEco Only the infrastructure of a single data center can be managed, and the centralized and unified management of multiple geographically divided data center infrastructures is not possible.



Answer : B


Question 6

UPS The front-end input can be two mains, one main and one standby, or one mains and one diesel engine input.



Answer : A


Question 7

Huawei Monitoring System NetEco Must not support monitoring of third-party devices.



Answer : B


Page:    1 / 14   
Total 204 questions