Question 1

Which two statuses of a Purchase Order will allow a receipt of new items to be processed in the Receiving application if the Purchase Order is not being revised?



Answer : A, C

In IBM Maximo Manage, if a Purchase Order is not being revised, two statuses that will allow a receipt of new items to be processed in the Receiving application are APPR and INPRG.


Question 2

In the Meters application what are the three meter types?



Answer : A, B, C

In the Meters application, the three meter types are GAUGE, CHARACTERISTIC, and CONTINUOUS. GAUGE meters measure a discrete value or range of values, such as the oil pressure in an engine. CHARACTERISTIC meters measure a specific attribute of an asset, such as the temperature of an engine. CONTINUOUS meters track usage or consumption over time, such as the number of hours an asset has been in operation.


Question 3

To what type of objects can a Service Level Agreement be applied?



Answer : A

A Service Level Agreement can be applied only to objects based on the Work Order or Ticket Classes, and Assets, Locations and Configuration Items.


Question 4

In what Maximo Manage application are the specifications of an asset for calibration entered?



Answer : C

In IBM Maximo Manage, the specifications of an asset for calibration are entered in the Data Sheet Template application.


Question 5

What happens if the Specification of a rotating item is updated in the Item Master application?



Answer : A

If the Specification of a rotating item is updated in the Item Master application, new locations and assets that reference the rotating item will inherit the changes. There are no changes to existing locations and assets.


Question 6

In the Work Order Tracking application, a Work Order is generated from a Preventive Maintenance (PM) record. How is the target finish date calculated?



Answer : C

In the Work Order Tracking application, when a Work Order is generated from a Preventive Maintenance (PM) record, the target finish date is calculated as the Work Order target start date + the Job Plan duration.


Question 7

At what database level does a Job Plan exist?



Answer : C

A Job Plan exists at the SITE level in IBM Maximo Manage.