Microsoft Dynamics 365 Supply Chain Management, Manufacturing MB-320 Exam Practice Test

Page: 1 / 14
Total 207 questions
Question 1

A company produces multiple products that require an installation kit that includes 50 components.

The company does not want to include these 50 components in every Bill of materials (BOM). You have a BOM kit that includes all 50 components, but you do not want it to produce a separate production order.

You need to set up the product BOM for the finished good.

What should you do?



Answer : C


Question 2

You are a functional consultant for Contoso Entertainment System USA (USMF).

You need to configure the system to ensure that planned master orders generated by Material Requirements Planning (MRP) contain trade agreements.

To complete this task, sign in to Dynamics 365 portal.



Answer : A

Navigate to the Master Planning Parameters form (Master Planning > Setup > Master Planning Parameters).

Select the Planned Orders tab.

Select the Find Trade Agreements option.

Save the changes.


https://docs.microsoft.com/en-us/learn/modules/configure-use-master-planning-dyn365-supply-chain-mgmt/03-parameters

Question 3

A chemical manufacturing company uses Dynamics 365 for Finance and Operations. A batch of material has a

quality issue and must be reworked.

You need to create the rework order the production.

Which three options must be set? Each correct answer presents part of the solution.

NOTE: Each correct selection is worth one point.



Answer : A, B, D


Question 4

You are the production planner for a manufacturing company.

After running operations scheduling for a production order, the following error message displays:

You need to identify the cause of the error.

Which two actions should you perform? Each correct answer presents part of the solution.

NOTE: Each correct selection is worth one point.



Answer : B, C


Question 5

You need to create the production orders for standard model bicycles.

Which method should you use?



Question 6

You are a production manager at a company which produces large batches of coffee and creamers.

After a quality inspection, batch 120008 of you cold brew coffee (item number CB-0001) was found to be too acidic and must be reworked.

You need to add 20 grams of sugar and stir the product for an additional 0.5 hours.

What three actions are required on the rework order? Each correct answer presents part of the solution.

NOTE: Each correct selection is worth one point.



Question 7

You are the production supervisor at a chemical processing plant. You must track attributes for each batch of

chemicals. Automated quality orders must be generated when a batch order for these chemicals is reported as

finished.

You need to ensure that the values of attributes are updated and tracked.

What three actions should you perform? Each correct answer presents part of the solution.

NOTE: Each correct selection is worth one point.



Page:    1 / 14   