Question 1

You are deploying an 8-node AFF A700 by using BES-53248 cluster switches. During the installation, you notice that ports higher than 16 are not coming online. You verify that the additional licenses are installed.

Which two additional steps must be taken to bring the additional ports online? (Choose two.)



Answer : B, D


Question 2

Click the Exhibit button.

You are preparing to replace a Cisco Nexus 92300YC switch. You have executed the cluster ping-cluster node1 command and received the output as shown in the exhibit.

Which two checks indicate that the cluster is ready for the replacement to be performed? (Choose two.)



Answer : A, D


Question 3

Click the Exhibit button.

You are attempting to add a new ONTAP 9.7 node to your ONTAP 9.8 NetApp cluster. After attempting to add the node, it fails as shown in the exhibit.

What are two nondisruptive ways to add the new node to your ONTAP cluster? (Choose two.)



Answer : C, D


Question 4

You are preparing to install a new 2-node AFF A250 system at a customer site with an existing cluster that uses NetApp CN1610 cluster interconnect switches.

In this scenario, what are two valid actions for this installation? (Choose two.)



Question 5

Which two switch operating system are supported on ONTAP cluster switches? (Choose two.)



Answer : B, D


Question 6

Click the Exhibit button.

You are installing a new AFF All SAN Array A700 HA pair.

Referring to the exhibit, which IP address would have been used to join node 02 to the cluster during setup?



Answer : A


Question 7

You are expanding an existing 4-node ONTAP 9.8 cluster with a FAS8300 HA pair by adding a new FAS500f HA pair. Before the expansion, you are asked to save the configuration of the cluster to a backup file.

In this scenario, which two ONTAP configuration backup methods are available? (Choose two.)



Answer : A, C