Refer to the exhibit.
Assuming a prospect is currently using Thick Provisioned virtual disk, at a minimum, which two tabs should be evaluated in an RVTools report to determine required resources for sizing? (Choose two.)
Answer : A, C
AN SE determines that a POC is necessary to overcome competitive FUD in an opportunity with an Enterprise account evaluating several HCI solutions. The customer will evaluate three
solutions in their datacenter simultaneously over the course of 4 days.
The customer schedules all necessary personnel to be available during this time.
Which two network planning items should the SE determine prior to allocation hardware for the POC? (Choose two)
Answer : D, E
Customer requests a 30-day POC to test Microsoft SQL Server performance on Nutanix compared to existing infrastructure.
Which action should be taken to avoid the POC?
Answer : C
An SE is performing a sizing exercise for a large financial institution.
They plan to move 8000 VMs to Nutanix AHV manage those clusters using Prism Central.
Which sizing configuration should the SE use for each Prism Central VM?
Answer : C
A prospect provides the following details for sizing active working set based on their existing server virtualization environment:
Full backup reports:
January: 10TB
February: 11TB
March: 12TB
April: 13TB
May: 14TB
Average Read/Write Ratio - 75/25
When entering a Raw Input in Sizer, what should the SE use as the minimum amount of required SSD Storage?
Answer : B
A Nutanix customer needs to migrate 1000VMs from ACME Public Cloud to a local Nutanix cluster ACME Public Cloud operates on VMware ESXi, Hp ProLiant Servers with 3PAR storage. ACME Public Cloud denies customers access to vCenter or ESXi hosts But they do replicate a copy of the virtual disks to external storage.
Which method should the customer use to migrate the VMs to a local Nutanix Cluster?
Answer : D
An SE is using the output from RVTools to size the storage capacity for a Nutanix Cluster.
Which value most closely resembles the minimum required storage capacity that should be entered for the aggregate workload in sizer?
Answer : C