SAP C_FSUTIL_60 SAP Certified Associate - Utilities with SAP ERP Exam Practice Test

Page: 1 / 14
Total 80 questions

Question 1

Which of the following processes is unable to establish a billing construct that is billable?



Answer : A

Question 2

A housing cooperation builds a new apartment complex with 10 units. Each apartment is individually provided with electricity and is expected to be billed separately. The electricity company requires that all meters measure on and off-peak consumption. All meters should be centrally installed.

What is the minimum number of data objects you need to create?



Answer : D

Question 3

You define portions and meter reading units (MRUs) for a customer who bills monthly on an interval basis. Every other month is scheduled to be estimated.

Which settings can be maintained during schedule master record configuration? (Choose two)



Answer : A, B

Question 4

You want to perform period-related billing using load shape data.

How would you set this up?



Answer : C

Question 5

A device can be installed in different ways.

What information do you need specifically for a technical installation?



Answer : D

Page:    1 / 14   
Total 80 questions