You have a schedule agreement whit a vendor. You want classic MRP to automatically create schedule lines in case of material
shortage.
What must you do?
Answer : A, C
How can you achive a feasible production plan in case of capacity constraints?
Answer : A, B, D
If the stock level drops below the reorder stock in reorder point planning, what logic would the system use to trigger procurement?
Answer : A
What detremines whatherthe planned independent requirements in MRP are consumed by other requrements?
Answer : D
An issue storage location was NOT found through the work center, bill of material(BOM) item, or material master. What determines whether the storage location can be derived from the production version?
Answer : A
What are the possible results of a production planning run in Advanced Planning (PP/DS)?
Answer : A, C, E
What does forecasting in demand planning cycle include?
Answer : B, C, D