SAS Certified Data Integration Developer for SAS A00-260 Exam Practice Test

Page: 1 / 14
Total 70 questions
Question 1

The purpose of change management in SAS Data Integration Studio is to manage:



Answer : C


Question 2

After creating a stored process from a SAS Data Integration Studio job, how can you test the stored process to make sure it runs correctly?



Answer : C


Question 3

Assume that a SAS Data Integration Studio job is populating a table, and the table has metadata definitions for two simple indexes. Which of the following is NOT a valid location for viewing which columns are indexed?



Answer : A


Question 4

When using the SCD Type 2 load method in SAS Data Integration Studio, which statement is true when a change is detected?



Answer : C


Question 5

Consider the job flow diagram in the display. Assume the inner job has a parameter defined specifying a table name. Which statement is FALSE?



Answer : B


Question 6

The SAS Platform application that can surface the different types of business and analytic content such as information maps, stored processes, and reports on the web browser is:



Answer : A


Question 7

Assume that SAS Data Integration Studio Table Loader is being used in a job. The load style selected is Update/Insert. Which statement is true regarding theAssume that SAS Data Integration Studio? Table Loader is being used in a job. The load style selected is Update/Insert. Which statement is true regarding the relationship between the source table and the target table?



Answer : D


Page:    1 / 14   
Total 70 questions