A customer requires a high-availability SAN for disk access. The disk array and server may each
have multiple ports. How many Fabric switch ports are necessary for full redundancy in a network
with one disk array and one server? (Note: throughput is not a consideration.)
Answer : B
When designing a high availability solution that relies on SAN infrastructure, which three steps
should be taken? (Choose three.).
Answer : A, C, E
What is the most important factor in determining sustained bandwidth in an IP SAN with high
bandwidth with long delays?
Answer : D
An administrator has put the database recovery logs on the same volume group as the data files.
The administrator is going to restore the data files from a snapshot. What should be done first?
Answer : C
When planning a NAS solution, which two sub-processes are associated with Business Capacity Management for a NAS solution? (Choose two)
Answer : A, B
A host is using only 10 percent of a 64 GB volume. Which solution would enable you to reclaim The wasted disk space?
Answer : B
When planning a NAS solution, which two sub-processes are associated with NAS Service
Capacity Management? (Choose two.)
Answer : B, C